A medium wind feasibility study at Park House Farm, Desford.
| Date: | September 2010 |
| Technology: | Medium Wind |
| Capacity: | 2 x 250kW |
| Scope of works: | Feasibility |
Objective:
To determine the capacity and model of wind turbine that could be installed at Park House Farm.
Outcome:
The feasibility study determined the Park House Farm infrastructure can accommodate up to 2 x 250kW wind turbines. Park House Farm is an ideal site for turbines, basic further work is required to take the project through to a formal planning application.
The basic work currently in progress Ecology, Archaeology, Noise and Visual studies and further pre-planning discussions are proposed with Hinckley and Bosworth Council in view of a formal planning application submission in Spring 2011.
Paul Hilyer:
“Work carried out on the feasibility study by ICE was both thorough and accurate which gave us the confidence to progress the project to the next stage.”