Wind Turbines

A Farm in Linconshire
Works consisting from feasibility through to installation for the first Vergnet 275kW wind turbine to be installed in the UK at a farm in Lincolnshire.

New Holbeck Farm
A planning application for a 275kW Vergnet wind turbine at New Holbeck Farm, Newark.
Lochmailing Farm
A small wind planning package was delivered for Lochmailing, an arable farm in Dumfries.
Alton Farm
A medium wind feasibility study for a dairy farm in Aberdeenshire to offset energy supply and sustain customers.
Park House Farm
A medium wind feasibility study at Park House Farm, Desford.
Knowsley Safari Park
A Medium wind feasibility study at the Knowsley Safari Park, Merseyside.
Boots UK Ltd
An initial wind feasibility study for Boots UK Limited headquarters in central Nottingham.
Solar Installations

William Davies Homes Ltd
A number of bespoke Solar PV installations have been designed for William Davis Homes. A 14.1kW installation was designed for a development at Horninglow Street, Burton-Upon-Trent.
Leeds University
The installation of Solar PV upon the newly refurbished School of Earth and Environment at Leeds University.
Anaerobic Digestion

Hurst Farm
An investigation into the possible installation of an Anaerobic Digestion plant at Hurst Farm, Staffordshire.



Follow, Connect or Share